For detail view click HERE
For video viewing click HERE
For detail view click HERE
Mural Virtual Reality:
Virtual
reality illustrating wall sections of permanent mural installation titled: “History
of Chilean Mining Mural” at the
University of
Concepción,
Chile. Section A (12.30MT x
3.15MT) concerns the history of Chilean mining from Pre Colombian period
(c.2200 BC) to contemporary times. Section
B (8.20MT x 4.20MT) illustrates mining process where the model of reference
was the largest underground mine in the world “El Teniente”, copper mine which began its operations in 1905 with
Braden Copper Company.
This
project which had its genesis in 1998 under a common agreement between Chilean Bureau of Mines and the
University of
Concepción, was to establish a policy of projecting the image of
Chile
through out the world as a mining culture. Its first phase with the
materialization of the mural at the
University of
Concepción
was sponsored by El Teniente DivisionCODELCO-CHILE commemorating the
centenary of Chilean large scale copper mining 1905-2005.
Realidad
Virtual del Mural:
Realidad virtual ilustrando secciones del mural
permanente titulado: “Mural Historia de la Minería Chilena”
emplazado en la Universidad de Concepción, Chile. Sección A (12.30MT x 3.15MT) concierne la historia de la minería
chilena desde el periodo Precolombino (c. 2200 AC) hasta tiempos
contemporáneos. Sección B (8.20MT x
4.20MT) ilustra procesos mineros donde el modelo de referencia fue la mina
subterránea más grande del mundo: “El Teniente”, mina de cobre que inicio sus
operaciones en 1905 con Braden Copper Company.
Este proyecto que tuvo su génesis en 1998 bajo el
común acuerdo del Ministerio de Minería
y la Universidad de Concepción con
el propósito de establecer una política de proyectar alrededor del mundo, la
imagen de Chile como cultura minera. Su primera fase con la materialización del
mural en la Universidad de Concepción, fue financiada por la División El Teniente de CODELCO-CHILE
conmemorando el centenario de la gran minería en Chile 1905-2005.
For detail view click HERE
Mural Section:
Section
plan E-E illustrating west wall elevation and its relationship to first level
main hall, second level laboratories and third level faculty staff
offices.
Corte del
Mural:
Corte E-E ilustrando elevación poniente del mural
y su relación pasillo en el primer nivel, laboratorios en el segundo nivel y
oficinas docentes en el tercer nivel.
Back to top ▲
For detail view click HERE
Mural
Anchoring System:
Mural
modular system anchored with steel enamelled stretcher bars. The objective was
to achieve a “floating effect” with a 5 mm shadow line between each panel. The
overall shadow box type installation is to convey a pictorial space rather than
an oversize picture frame, similar to the concept of Chinese lacquer screen
painting or Japanese rice paper Shoji screens.
Sistema de
Anclaje del Mural:
Sistema de anclaje modular del mural con
bastidores de acero esmaltados. El objetivo fue crear un efecto de flotado con
una línea de sombra de 5mm entre cada panel. Este tipo de instalación como
cajas de sombra se vincula con la idea de un espacio pictórico, contrario a un
cuadro pictórico sobre dimensionado. Este concepto es similar a los biombos
chinos y las panderetas de papel de arroz japonesas.
For detail view click HERE
Mural Installation General Views:
Main
floor, second and third level views of mural installation and veil dismantle
during inauguration ceremony at the
Metallurgical
Engineering
Building,
University of
Concepción,
August
26, 2005.
Vistas
Generales del Mural:
Vistas piso principal, segundo y tercer nivel del
mural en el momento de su desvelamiento durante la ceremonia inaugural el 26 de
agosto de 2005 en el edifico de Ingeniería Metalúrgica de la Universidad de
Concepción.
For detail view click HERE
Mural General Distribution:
I. Historical Section (12.30 MT x 3.15 MT):
From top to bottom the
mural section illustrates more than 4.000 years of mining
history in the Andean world, a distribution of 3 vertical panels (2.05 MT x
1.05 MT) in 6 rows divided into 6 sections as follows:
i. Pre
Colombian Period and the Bronze Age.
ii. Spanish conquest and the introduction of the Iron Age.
iii. Colonial Period and the independence of
Chile.
iv. Industrial Revolution and the industrialization of
mining industry.
v. The emergence of
large scale mining.
vi. Development of mineral sciences.
II. Mining Process Section (8.20 MT x 4.20 MT):
From top to bottom the mural section illustrates mining process where
“El Teniente” copper mine near
Rancagua,
Chile. With a distribution of 4 vertical panels (2.05 MT x 1.05 MT) in 4 rows
divided into 4 sections as follows:
i. Sewell mining town and productive
section.
ii. Primary and secondary crushing plants.
iii. Metallurgical process and extraction plants.
iv. Smelting plant and final products.
Distribución General del Mural:
I. Sección Histórica (12.30 MT x 3.15 MT):
Desde arriba hacia abajo
el mural ilustra más de 4.000 años de historia minera en el mundo andino, con
una distribución de 3 paneles verticales (2.05 MT x 1.05 MT) en 6 niveles
alusivas a las siguientes 6 secciones:
i. Periodo Precolombino y era
del bronce.
ii. Conquista española y la
introducción de la era
del hierro.
iii. Periodo colonial y la independencia de Chile.
iv. Revolución industrial y
la industrialización de la minería.
v. Surgimiento de la gran minería.
vi. Desarrollo de las
ciencias mineras.
II. Sección Procesos Mineros
(8.20 MT x 4.20 MT):
Desde arriba hacia abajo,
las secciones ilustran procesos mineros vinculados a la mina El Teniente
ubicada al oriente de Rancagua, Chile. Con una distribución de 4 panels
verticales (2.05 MT x 1.05 MT) en 4 niveles alusivas a las siguientes 4
secciones:
i. Sewell ciudad minera y areas productivas.
ii. Changador primario y
planta SAG de molienda secundaria.
iii. Procesos metalúrgicos y plantas extractivas.
iv. Planta de fundición y productos finales.
Back to top ▲
|